How to Measure Projects Success: Successful vs Troubled vs Failed Projects2 min read

Traditional Models

There are a lot of rating models out there that attempt to define project success or failure. There is the traditional one:

  • Success: Finished (more or less) on time, within budget and met all requirements
  • Challenged:  Reaches conclusion, but with cost overruns and schedule slippages; possibly not all specifications are met
  • Failure: Project was abandoned or cancelled due to project management failure

I can’t say that I am a big fan of it, because it fails to incorporate the value (i.e. the project portfolio management) perspective into the model. Recently I came across the one I really liked – a model that considers both project management (PM) and project portfolio management (PPM) sides proposed by Harold Kerzner:

  • Complete Success: Project met success criteria, value was created and all constraints were adhered to
  • Partial Success: Project met the success criteria, the client accepted the deliverables, value was created, not all of the constraints were met
  • Partial Failure: Project was cancelled. But some IP was created that can be used on other projects
  • Complete Failure: The project was abandoned and nothing was learned

Proposed Model

My view of a successful project is slightly different. I basically like to (1) add word “reasonably” to the “adhering to constraints” sentence and (2) include the recoverability variable into the equation:

  • Project success is a function of:
    • Business value is realized
    • Project is delivered reasonably on-budget
    • Project is delivered reasonably on time
    • Project scope is delivered within reasonable limits
    • NOTE: “reasonable” = “does not negate the business value”
  • Projects should also be differentiated by their recoverability

Regarding the first point, let us examine the following famous examples:

  • Titanic movie (cost -$200 million vs. revenues – $2 billion)
  • First iPhone (cost – $150 million, revenues – $2.7 billion)
  • Grand Theft Auto 5 (cost – $265 million, revenues – US $1 billion in its first three days!)

Would we call Titanic a troubled project if it was released on 18-Jan-1998 instead of the original 18-Nov-1997? Would we think of the iPhone as a failure if its development ended up costing $160 million instead of the original $150 million? Of course, not!

So, what happens if we try to look at projects from the PM success/failure, PPM success/failure and recoverability/non-recoverability perspective .In the upper left corner (green) we have projects that are on track both from the PM and PPM perspectives. These ventures should be just properly monitored and controlled until their successful completion.

The next(yellow) layer contains the troubled projects (either on the PM and/or PPM side), but these projects can still be saved by adjustments to their scope, schedules, budget, governance etc.

Finally, the last layer (red) consists of the projects that are so deep in trouble from PM and/or PPM viewpoints that the only option available to the stakeholders is to kill them, unless they are “stay-in-business” or regulatory initiatives.

What do you think of this project success/failure rating? What other approaches have you seen?

This was a guest article written by Jamal Moustafaev from Thinktank Consulting.

SHARE THIS POST

LinkedIn
Twitter
Facebook

Related Blog​s

Project Portfolio Management
Tim Washington

Greater Value From Portfolio Management Systems

Enterprise repository (“single source of truth”)—having a single system that contains up-to-date and accurate project and portfolio data is valuable. Gone are the days of maintaining multiple versions of static Excel files that contain the current “authorized” list of projects. This value is magnified easier to access the system and the greater

Read More »
Project Portfolio Management
Dinesh Kashyap

IT Business Management – Run IT as Business

IT Business Management is a framework and approach that brings together people, process and technology to enable organizations to manage IT with real-time visibility, agility and support change and innovation. ITBM improves visibility on cost and performance and helps CIO and IT leaders to make right decision at the right

Read More »
Project Portfolio Management
Jamal Moustafaev

How to Prioritize Project Features and Explain the Process to the Stakeholders

When the Requirements Specifications is complete, the project manager (or the business analyst) must inspect the document with all the stakeholders in order to (along with other very important things) prioritize all of the project features and/or requirements. Project features have to be prioritized for the following reasons:Prioritization eliminates unnecessary, frivolous scope items added